Do you place and finish concrete? +

We can refer you to qualified independent contractors who can provide quotes for concrete placement and finishing services. If you prefer, we can also help coordinate concrete removal, forming, supply, and finishing. Please specifically ask for the "One Price" option if you would like to explore this arrangement. Our website also provides practical tips and resources for customers who prefer to complete their concrete projects themselves.

Do you have pump trucks or have a way to pump from the truck to the site? +

Yes. Yard At A Time offers concrete pumping options for residential and commercial projects that require additional reach or placement flexibility. Our team can help you explore suitable pumping arrangements based on your project requirements, site access, and equipment availability. Contact us to discuss your concrete delivery and pumping needs.

How far do your chutes reach to off load ready-mix concrete? +

Chute length varies depending on the concrete truck. For example, our Tandem Axle Truck has a listed chute length of 12 ft 6 in, while our Twin Steer Booster Truck has a listed chute length of 14 ft 4 in. Actual concrete placement reach depends on truck positioning, chute angle, site access, and whether the chute needs to swing to the side. Contact our team to confirm the appropriate truck and delivery setup for your project.

Do you have accessibility to back lanes? +

Our smaller ready-mix trucks can fit in most back lanes in the Metro Vancouver area. A good indication is that wherever the garbage trucks can go, we can go.

Do you carry a wheelbarrow on the truck and can you carry more than one? +

Our ready-mix concrete trucks carry a wheelbarrow for customer use at no additional charge. This service does not apply to booster trucks. If you require more than one wheelbarrow, please contact our team before scheduling your delivery to confirm availability and arrangements.

Can I pay by cheque? +

We accept Visa, Mastercard, and cash. If you wish to pay by cheque, please contact our office in advance to confirm whether this payment method is accepted. A 2.5% convenience fee applies to all credit card payments. Credit card payments must be arranged with our office before batching to confirm delivery. If paying by cash, please note that our drivers do not carry change. Unless approved in advance, orders are payable on delivery. For approved account customers, payment is due within 30 days of delivery.

How long do you allow for offloading time? +

We generally allow 8 minutes of offloading time per cubic metre of ready-mix concrete, included in the delivery price. If unloading exceeds the allotted time, additional standby charges may apply according to YAAT's current standard rates. We recommend preparing your site before delivery and ensuring that the crew and equipment are ready to receive the concrete. For details about unloading allowances and applicable standby charges, please contact our team before placing your order.

If it is raining, can I pour my concrete? +

If you decide to pour and finish concrete when it is raining, it is important to have the site area covered so that the surface does not get saturated with water and cause runoff.

Can I pour concrete when it is freezing? +

It is important to keep the freshly poured concrete from freezing and it should never be poured on frozen ground. Refer to tips for winter concrete for more information. Concrete needs to set and gain strength to resist the freezing stresses. Adding accelerator will help the concrete set quickly. Strength gain is a function.

Can I pour concrete when the weather is hot? +

The morning when the air is cool, is the best time to pour concrete on a hot summer day. Keeping the area shaded, the sub grade moist, and away from the heat of the sun (careful that it is not poured in mud) will also help.

Adding retarder will help slow down the chemical reaction and provide you with more time to work with the concrete. The added longevity will aid in the finishing process.

Please refer to tips for summer concrete for more information.

How do I figure out how much concrete I need? +

Measure up your area (accuracy is important) and use this concrete calculator or give our office a call and one of our customer service representatives will be happy to assist you.

What is the difference between yards and metres? +

Yards and metres are units of length, while cubic yards (yd³) and cubic metres (m³) measure volume. In concrete construction, these units are used to calculate the quantity of concrete required for a project. **1 cubic yard = approximately 0.765 cubic metres.** **1 cubic metre = approximately 1.31 cubic yards.** In Canada, ready-mix concrete is typically ordered in cubic metres. Understanding these conversions helps ensure accurate concrete quantity calculations.

Do you supply colour in your concrete? +

We proudly supply colour that can be added to the concrete. To ensure accuracy when ordering colour, it is important to order the correct quantity and strength of mix for your intended usage. If you have any questions regarding colour choice or availability, please stop by our office and a customer service representative will gladly assist you.

What size of aggregate is in your exposed mix and what if I want to match to existing concrete? +

We have two sizes of Chilliwack exposed concrete. We have the standard 10 mm or smaller 5 mm aggregate sizes available. It should be noted that it will be difficult to match with existing concrete due to colouring. You are welcome to come down to our plant and take a sample of the aggregate.

Do you supply anchor bolts and do you have a vibrator that I can rent? +

We have anchor bolts that we can supply. Please note you need to mention at the time of ordering, including the size, so that the driver will have the supply with him at time of delivery. We no longer supply vibrators.

Can you give me a per yard or per metre price? +

At Yard At A Time, we provide high-quality ready-mixed concrete at an exceptional value. Pricing depends on the concrete mix, order quantity, delivery location, and project requirements. Contact our team for an accurate quote based on your specific needs.

Are you able to deliver on a Saturday or Sunday and are there extra charges for a weekend delivery? +

All deliveries are based on availability. However, during our peak season of May – September, it is usually recommended that you order two to three days in advance, especially for a Saturday delivery. We are quite flexible during our low season and usually can service our customers within a day’s notice; if you call us in the morning, a delivery can sometimes be arranged that very day.

How far in advance should I order? +

All concrete deliveries are subject to availability. During our busy construction season, typically April through October, we recommend placing your order at least two to three days in advance, especially for Saturday deliveries. Outside this period, scheduling may be more flexible, and next-day or same-day delivery may be possible depending on availability. Contact our team to confirm delivery options for your project.

Do you supply fibre? +

Absolutely. We have two types of fibre – PSI Fiberstrand 150, and Tuf Strand. The Fiberstrand is very thin, mesh-like pieces and is frequently used in our Radiant Floor mix to reduce surface cracking. The Tuf Strand is thicker wire-like pieces and can be used to increase strength.

Why does concrete crack? +

Concrete is a brittle material and cracks due to inability to flex under stress. Cracks easily spread through plain concrete because there are no fibres present to hold the surrounding substance together. Concrete that has not been cured but allowed to dry out the next day will also tend to have more unsightly cracks. It simply lacks the strength needed to hold itself together.